There's much to see here. So, take your time, look around, and learn all there is to know about us. We hope you enjoy our site and take a moment to drop us a line.
Plan, advise, and troubleshoot DIY
Review scope, site conditions, overview of options.
Guidance, Q&A, progress checks.
Bundle for owner-builder support.
Full project mentoring (pre-construction through completion) 5–10% of labour & materials or $2,000–$5,000+ Comprehensive owner-builder mentoring.
Build ready creative design packages
Early-stage concept drawings for app
Permit-ready construction drawings.
$8,000+ or 5–10% of construction cost Larger, engineered designs.
Revision allowance and resubmissions.
Geotechnical assessments for safe slopes
Residential hillside evaluation and recommendations.
Includes lab testing if required.
Monitoring, equipment, and reporting.
Code research and requirements mapping
Full package ready for city submission.
Site visits, reporting, liaising with inspectors.
Monitoring, equipment, and reporting.
Notes & Terms: • All prices are in Canadian Dollars (CAD) and exclusive of taxes. Travel, equipment, and third-party engineering fees may apply depending on scope. • Hourly work billed in minimum 2-hour increments. • Custom proposals available for holistic design, resilience-focused, and alchemy-inspired projects. • Contact: Marcel Comeau — Elemental Rise | Kelowna, BC
Ground-up builds and renovations
Quality build with durable finishes.
Bespoke, natural/earth materials.
Framing, finishes, permits.
Kitchens, baths, basements.
Design-build commercial and light industrial
Structural, envelope, core.
Interior build-out and finishing.
Concept-to-completion.
Transparent hourly labour and consulting rates
Skilled hands-on builder.
Carpentry, tile, electrical, etc.
Task dependent.
Client oversight / PM.
Concept, drawings, sourcing.
Keeps business viable and risks covered
Make up extra costs.
Cold weather slows work and requires heat, protection.
Extra travel, logistics, and mobilization costs.
Nonstandard materials add time and cost.
Overtime, premium labor, and expediting costs.
Extra design iterations and refinements
Access is harder, slower, riskier.
Cold weather slows work and requires heat, protection.
Extra travel, logistics, and mobilization costs.
Nonstandard materials add time and cost.
Overtime, premium labor, and expediting costs.
Keeps costs viable and risks covered.
Covers procurement costs and price volatility.
More trades mean scheduling and oversight.
Sustains operations, growth, and risk buffer.
Notes & Terms: • All prices are in Canadian Dollars (CAD) and exclude taxes. Estimates depend on site conditions, design complexity, and materials. • Travel, equipment, and specialty trades billed separately as needed. • Minimum 2-hour billing increments for hourly work. • Elemental Rise specializes in natural, earthy, and resilient custom designs integrating holistic principles of craftsmanship and sustainability.